Poland vs Sierra Leone: Other pulses n.e.c. — Production, per square kilometre
Poland
1.32 t per square kilometre
in 2023
Sierra Leone
1.05 t per square kilometre
in 2023
Poland rank
7th
Sierra Leone rank
8th
Other pulses n.e.c. — Production, per square kilometre over time
- Poland
- Sierra Leone
How they compare
Poland currently reports 1.32 t per square kilometre against 1.05 t per square kilometre in Sierra Leone, a difference of 0.27 t per square kilometre.
That makes Poland's figure about 1.3 times Sierra Leone's.
The two have swapped places 12 times across 63 shared years of data; in 1961 it was Poland ahead.
Poland ranks 7th and Sierra Leone ranks 8th of 105 countries.
Across the 7 decades both report, Poland averaged higher in 4 and Sierra Leone in 3.
Head to head by decade
| Decade | Poland | Sierra Leone | Difference | Ahead |
|---|---|---|---|---|
| 1960s | 0.3602 t per square kilometre | 0.331 t per square kilometre | 0.0293 t per square kilometre | Poland |
| 1970s | 0.3281 t per square kilometre | 0.3658 t per square kilometre | 0.0377 t per square kilometre | Sierra Leone |
| 1980s | 0.6549 t per square kilometre | 0.4343 t per square kilometre | 0.2205 t per square kilometre | Poland |
| 1990s | 0.6519 t per square kilometre | 0.5337 t per square kilometre | 0.1183 t per square kilometre | Poland |
| 2000s | 0.4643 t per square kilometre | 0.8202 t per square kilometre | 0.3559 t per square kilometre | Sierra Leone |
| 2010s | 0.7499 t per square kilometre | 1.02 t per square kilometre | 0.2721 t per square kilometre | Sierra Leone |
| 2020s | 1.1 t per square kilometre | 1.05 t per square kilometre | 0.0513 t per square kilometre | Poland |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher other pulses n.e.c. — production, per square kilometre, Poland or Sierra Leone?
- Poland, at 1.32 t per square kilometre against 1.05 t per square kilometre in Sierra Leone as of 2023.
- What is the difference in other pulses n.e.c. — production, per square kilometre between Poland and Sierra Leone?
- 0.27 t per square kilometre, with Poland ahead.
- How many years of comparable data are there for Poland and Sierra Leone?
- 63 years are reported by both, from 1961 to 2023.
- How do Poland and Sierra Leone rank globally for other pulses n.e.c. — production, per square kilometre?
- Poland ranks 7th and Sierra Leone ranks 8th of 105 countries.
- Where does this data come from?
- Statizoid (derived), published as Other pulses n.e.c. — Production, per square kilometre. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Other pulses n.e.c. — Production divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.