Guinea vs Uruguay: Oranges — Production, per square kilometre
Guinea
0.621 t per square kilometre
in 2023
Uruguay
0.6009 t per square kilometre
in 2023
Guinea rank
41st
Uruguay rank
42nd
Oranges — Production, per square kilometre over time
- Guinea
- Uruguay
How they compare
Guinea currently reports 0.621 t per square kilometre against 0.6009 t per square kilometre in Uruguay, a difference of 0.0201 t per square kilometre.
The two have swapped places 3 times across 9 shared years of data; in 2015 it was Uruguay ahead.
Guinea ranks 41st and Uruguay ranks 42nd of 120 countries.
Uruguay has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Guinea | Uruguay | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 0.4478 t per square kilometre | 0.6921 t per square kilometre | 0.2443 t per square kilometre | Uruguay |
| 2020s | 0.573 t per square kilometre | 0.6157 t per square kilometre | 0.0427 t per square kilometre | Uruguay |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher oranges — production, per square kilometre, Guinea or Uruguay?
- Guinea, at 0.621 t per square kilometre against 0.6009 t per square kilometre in Uruguay as of 2023.
- What is the difference in oranges — production, per square kilometre between Guinea and Uruguay?
- 0.0201 t per square kilometre, with Guinea ahead.
- How many years of comparable data are there for Guinea and Uruguay?
- 9 years are reported by both, from 2015 to 2023.
- How do Guinea and Uruguay rank globally for oranges — production, per square kilometre?
- Guinea ranks 41st and Uruguay ranks 42nd of 120 countries.
- Where does this data come from?
- Statizoid (derived), published as Oranges — Production, per square kilometre. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Oranges — Production divided by Land area (sq. km), matched on country and year. Neither publisher issues this ratio as a series; it is computed here from both.